No apologies, more of the T34 T “Tyagach”, as correctly highlighted. Build complete now, off for priming, if anything shows the work involved and stages.
a) tarpaulins game added out of procreate/milliput
b) two types of tow cable added from twisted wire
c) engine cover grab handle added, with other odd detailing
d) foundation layer of mud
e) bashed the front track guards to reflect heavy use.
The hull is still in two, I can’t glue together until the driver is painted and stuck in place.
Three stage priming and foundation coats next prior to base coat. If interested will try and document as I go.
a) tarpaulins game added out of procreate/milliput
b) two types of tow cable added from twisted wire
c) engine cover grab handle added, with other odd detailing
d) foundation layer of mud
e) bashed the front track guards to reflect heavy use.
The hull is still in two, I can’t glue together until the driver is painted and stuck in place.
Three stage priming and foundation coats next prior to base coat. If interested will try and document as I go.
6 comments:
Great work love all the added details very interested to see the next stages Neil.
Looks great, nice details!
Thanks, has it’s base coat now, two stage paint as I had to Paint and add the driver then glue tighter and sand the seal
Post a Comment